Crafting Strength, Building the Future
Over 30 years of metal fabrication and construction expertise
Delivering cutting-edge manufacturing solutions that redefine expectations
Ensuring precision, safety, and lasting quality on every project
Quicker turnarounds with our in-house engineering and detailing team
State of the art equipment combined with experienced tradespeople allows us to provide the results our clients demand.
Our installation team has mastered the art of managing intricate installations under diverse conditions.
Norfab utilizes state of the art equipment to deliver precision results
Prodevco PCR42
Advanced CNC robotic plasma cutting solution7-axis operation
Messer FiberBlade V 4020
State of the art 6′ x 12′ laser tableUp to 200m/min cutting speed
Amada Hg 2204 Press Brake
247 tons of bending pressureHigh volume capacity, bending material up to 12′ wide
We are happy to share some of our completed and in progress projects over Norfab’s history. Past projects are added weekly, stay tuned!
An iconic project that has complimented Edmonton’s landscape for decades to come.
A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
Revitalizing the downtown core.
The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.
Head OfficeOperating Hours: Mon-Fri 7:30AM – 4:30PM
Mailing Address:16425 130 Avenue NWEdmonton, AB T5V 1K5
InquiriesFor any inquiries, questions please call(780) 447-5454
Norfab Mfg (1993) Inc. © All Rights Reserved