Revitalizing the downtown core.
PCL Construction / Stantec / AECOM / City of Edmonton / Stantec
City of Edmonton / Katz Group
2014 - 2020
Atrium Structural Glazing Wall (Design Build) Stainless Elevator Cladding, Corridor Base Rake Trims, Entrance Gilles, Canopy Glazed Supports, Exterior Stainless Railings, Overhead Door Supports, Parkade Entrance Guides and Card Posts Readers, Tower Shaft Exit Railing, Penthouse Stairs and Structural Framing
Working with PCL, and many additional subtrades, to revitalize the downtown core was a project to be remembered
Tower D: Norfab worked on the free standing HSS entrance curtain wall for two months. The AESS specification and glazing wall tolerances required installation of a perfectly set HSS seamless substrate for other trades. Atrium custom polished Aluminum grilles, entrance stainless headers/jambs included. The elevator lobby stainless steel polish 8mm/6mm and 10ga trims presented the most challenging scope. Installation crews spent months setting custom-built substrates to accept glass & wood accent panels and base covers.
Tower E: Stantec Tower was to become the tallest tower in Alberta. The Norfab team participated in this landmark project, visible for miles from multiple directions entering North/South/East or West.
We are happy to share some of our completed and in progress projects over Norfab’s history. Past projects are added weekly, stay tuned!
An iconic project that has complimented Edmonton’s landscape for decades to come.
A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.
Head Office
Operating Hours: Mon-Fri 7:30AM – 4:30PM
Mailing Address:
16425 130 Avenue NW
Edmonton, AB T5V 1K5
Inquiries
For any inquiries, questions please call
(780) 447-5454
Norfab Mfg (1993) Inc. © All Rights Reserved