Stantec Tower E & D - Rogers Place

Revitalizing the downtown core.

Client

PCL Construction / Stantec / AECOM / City of Edmonton / Stantec

Industry

City of Edmonton / Katz Group

Project Timeline

2014 - 2020

Awarded Scopes

Atrium Structural Glazing Wall (Design Build) Stainless Elevator Cladding, Corridor Base Rake Trims, Entrance Gilles, Canopy Glazed Supports, Exterior Stainless Railings, Overhead Door Supports, Parkade Entrance Guides and Card Posts Readers, Tower Shaft Exit Railing, Penthouse Stairs and Structural Framing

Project

Working with PCL, and many additional subtrades, to revitalize the downtown core was a project to be remembered

Tower D: Norfab worked on the free standing HSS entrance curtain wall for two months. The AESS specification and glazing wall tolerances required installation of a perfectly set HSS seamless substrate for other trades. Atrium custom polished Aluminum grilles, entrance stainless headers/jambs included. The elevator lobby stainless steel polish 8mm/6mm and 10ga trims presented the most challenging scope. Installation crews spent months setting custom-built substrates to accept glass & wood accent panels and base covers.

Tower E: Stantec Tower was to become the tallest tower in Alberta. The Norfab team participated in this landmark project, visible for miles from multiple directions entering North/South/East or West.

Trade Coordination Related Items / Miscellaneous Metals

  1. Curtainwall HSS framing
  2. Exit stair shaft railings
  3. Parkade mech pipe protection and block wall supports
  4. 316 Stainless Steel Platform Railings complete with laminated glazed panels and exterior tiles
  5. Cast in place entrance bollards
  6. Pedestrian exterior mat grating galvanizing
  7. Exterior patio stainless steel rails complete with glazing
  8. Stainless steel elevator lobby trims & cladding (Tower D)
  9. Trench grates & mechanical grilles

Completed & In Progress Projects

We are happy to share some of our completed and in progress projects over Norfab’s history. Past projects are added weekly, stay tuned!

The Running Trail

An iconic project that has complimented Edmonton’s landscape for decades to come.

River Valley Mechanized Access & Funicular

A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.

Stantec Tower E & D - Rogers Place

Revitalizing the downtown core.

Arrow Utilities Wastewater Treatment Plant Upgrade - Train 4

The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.

Find us in North West Edmonton

Head Office
Operating Hours: Mon-Fri 7:30AM – 4:30PM

Mailing Address:
16425 130 Avenue NW
Edmonton, AB T5V 1K5

Inquiries
For any inquiries, questions please call
(780) 447-5454

Norfab Mfg (1993) Inc. © All Rights Reserved