The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.
PCL Construction / Associated Engineering / Goldbar Contractors
Waste Water Treatment
2024 - 2026
Supply and install OWSJ, Structural Steel, Exit & Egress Stair, Embed, Brick Angle, Aluminum Clarifier Railings, Aluminum Bioreactor Rails, Aluminum Crossover Stairs & Rails, Aluminum Hatches and Checker plate covers, Blockwall Support, Crane Beams, and Swing gates.
For over 20 years we have contributed to WTP and WWTP plants throughout Western Canada
Phase 1: Mechanical-Electrical Supports, Pipe Supports Columns and Frames, Pipe Support cantilevered assemblies, Pipe Saddles (Stainless/Galvanized).
Phase 2: Bioreactor, MBR, and PEPS Structural Steel and Miscellaneous Metals.
Train 4 Arrow Utilities Wastewater Treatment Plant Upgrade is currently underway in the Strathcona County. The project will add a fourth secondary train using membrane bioreactor removal technology.
We are happy to share some of our completed and in progress projects over Norfab’s history. Past projects are added weekly, stay tuned!
An iconic project that has complimented Edmonton’s landscape for decades to come.
A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.
Head Office
Operating Hours: Mon-Fri 7:30AM – 4:30PM
Mailing Address:
16425 130 Avenue NW
Edmonton, AB T5V 1K5
Inquiries
For any inquiries, questions please call
(780) 447-5454
Norfab Mfg (1993) Inc. © All Rights Reserved