A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
Graham Construction / City of Edmonton / Dialog
Alberta/Edmonton Infrastructure
2017
Steel Stairs, Illuminated Guardrails, Wall Cladding, and Bridge Secondary Framing.
Norfab was awarded the Structural Stair stringers, elevator framing, and the miscellaneous metals on the North side Grierson Road. Miscellaneous metals scope and secondary framing on the Southside and connecting bridge structure.
The multiple Galvanized steel stringers that attached the lower elevation to the higher elevation were long span I beam complimented with integral plate work. The coordination involved to successfully allow for the glazing panel stations, precast seating panels, Kebony wood substrate, and illuminated hand railing made this both a challenging and rewarding project. The elevated bridge over Grierson road and on the south side, specifically adding substrates similar to the North, gave the River Valley experience a unique iconic physical appeal.
We are happy to share some of our completed and in progress projects over Norfab’s history. Past projects are added weekly, stay tuned!
An iconic project that has complimented Edmonton’s landscape for decades to come.
A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.
Head Office
Operating Hours: Mon-Fri 7:30AM – 4:30PM
Mailing Address:
16425 130 Avenue NW
Edmonton, AB T5V 1K5
Inquiries
For any inquiries, questions please call
(780) 447-5454
Norfab Mfg (1993) Inc. © All Rights Reserved