Calgary Central Library

Supplied and installed the miscellaneous metals scopes, including the iconic stairways

Client

Stuart Olson Construction / Dialog / AECOM / City of Calgary

Industry

Alberta/Calgary Infrastructure

Project Timeline

2013 - 2018

Awarded Scopes

Suspended Structural Atrium Stairs, Exits Railings, Podium Grilles, Ornamental Stainless railing, Children Play structure, Balcony Guard post, Mechanical Room secondary support, Borrowed light framing, Illuminated exterior Stainless Rails, Shutter Grills framing, Overhead Door Supports, and Loading Dock Protection.

Project

Working on the New Central Library alongside Stuart Olson and Dialog for this project was a true pleasure. The architectural and structural design of the building is truly a sight to behold. The unique design presented numerous challenges and opportunities for Norfab to innovate.

Norfab was responsible for all miscellaneous metal items, exit stairs, and exterior grating. Additionally, the ornamental metals, such as the exterior/interior stainless railings and landscaping metal items (excluding the Drinking Birds), were under our scope as well.

Highlights

The beginning highlight of the project was the Atrium Stairs. Norfab worked closely with Stuart Olson and their survey team, taking countless independent scans to evaluate the geometry. We worked closely with Dialog to resolve construction tolerances needed to make this a successful installation and fabrication.

Trade Coordination Related Items / Miscellaneous Metals

  1. BIM/3D scans. Trimble/Tekla/Revit collaboration and translation
  2. 320 grit stainless polished railings complete with banker wire Rieger products
  3. 60,000lb Atrium Structural Stairs, suspended between 60-80 feet long
  4. LRT stainless steel double swing heavy duty gates
  5. Right of way guides
  6. Integral framing for all Atrium open wood guardrail
  7. Knock down bollards/removable bollards
  8. Entrance grilles and mechanical grilles
  9. Stainless steel & aluminum wall protection, perforated Metal Panels
  10. Trench grates / mechanical grilles

Completed & In Progress Projects

We are happy to share some of our completed and in progress projects over Norfab’s history. Past projects are added weekly, stay tuned!

The Running Trail

An iconic project that has complimented Edmonton’s landscape for decades to come.

River Valley Mechanized Access & Funicular

A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.

Stantec Tower E & D - Rogers Place

Revitalizing the downtown core.

Arrow Utilities Wastewater Treatment Plant Upgrade - Train 4

The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.

Find us in North West Edmonton

Head Office
Operating Hours: Mon-Fri 7:30AM – 4:30PM

Mailing Address:
16425 130 Avenue NW
Edmonton, AB T5V 1K5

Inquiries
For any inquiries, questions please call
(780) 447-5454

Norfab Mfg (1993) Inc. © All Rights Reserved