Working with COWI and Graham Construction, Norfab was proud to be a partner during the revitalization of this piece of critical infrastructure.
Graham Construction Edmonton / COWI / City of Edmonton
Alberta/Edmonton Infrastructure
January 2018 - October 2020
Outrigger Framing Structures, Gantry Truss Structures, Crane Rails, Abutment Steel Rail System, Safety Maintenance Cable system
In 2018 one of Edmonton’s oldest and most reliable bridges was ready for a face lift. Norfab worked alongside Graham Builders and COWI during the revitalization.
Installing the steel required to utilize the bridge piers to maintain their integrity was an exciting process for the team. The outrigger framing was constructed to cantilever on both the East and the West sides of the existing bridge. Once the outrigger steel supports were completed, it was time to construct the 80-tonne Steel Gantry System to connect the North South piers.
We are happy to share some of our completed and in progress projects over Norfab’s history. Past projects are added weekly, stay tuned!
An iconic project that has complimented Edmonton’s landscape for decades to come.
A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.
Head Office
Operating Hours: Mon-Fri 7:30AM – 4:30PM
Mailing Address:
16425 130 Avenue NW
Edmonton, AB T5V 1K5
Inquiries
For any inquiries, questions please call
(780) 447-5454
Norfab Mfg (1993) Inc. © All Rights Reserved
