Orange Hub Parkade

Norfab worked with PCL Construction on a vision put forward by S2 Architecture for the Orange Hub facility.

Client

PCL Construction Edmonton / S2 Architecture / GH3 / City of Edmonton

Industry

Alberta/Edmonton Infrastructure

Project Timeline

January 2023 - January 2024

Awarded Scopes

Anodized Aluminum Parkade Enclosure Framing, Snow Chute and Snow Chute Framing, Theater Orchestra Pit Framing, Stage Lifting Steel, Bike Racks, Elevator Pit Framing, Pit Ladders, Roof access stairs, Concrete Stair Railing, and Steel Stairs.

Project

Orange Hub Phase II

Located on 100th Avenue and 156 street, the City owned Orange Hub has been a historic facility boasting many non-profit events, lectures, plays, musicals, and much more. The new parkade is a three-story structure looking next to Orange Hub. It will include 181 vehicle spaces as well as places for bicycles and motorcycles.

Highlights

The exterior Aluminum fencing and framing was designed to provide safety and security to the new parkade while also offering a unique look to the surrounding area.

Trade Coordination Related Items / Miscellaneous Metals

  1. Anodized aluminum pipe was utilized to provide vertical, horizontal, and elliptical framing.
  2. Stainless steel fasteners complete with isolation coated hardware to extend overall lifespan.
  3. Bituminous Barrier coated surface plates.
  4. Galvanized theater steel site measurements to suit existing mechanical.
  5. Snow chute and snow chute framing, galvanized segments, brush blasted, and two part wet coat system.

Completed & In Progress Projects

We are happy to share some of our completed and in progress projects over Norfab’s history. Past projects are added weekly, stay tuned!

The Running Trail

An iconic project that has complimented Edmonton’s landscape for decades to come.

River Valley Mechanized Access & Funicular

A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.

Stantec Tower E & D - Rogers Place

Revitalizing the downtown core.

Arrow Utilities Wastewater Treatment Plant Upgrade - Train 4

The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.

Find us in North West Edmonton

Head Office
Operating Hours: Mon-Fri 7:30AM – 4:30PM

Mailing Address:
16425 130 Avenue NW
Edmonton, AB T5V 1K5

Inquiries
For any inquiries, questions please call
(780) 447-5454

Norfab Mfg (1993) Inc. © All Rights Reserved